2026 Chinese New Year Holiday Schedule
Dear Customers and Partners,
In celebration of the 2026 Spring Festival, Seprays will observe a holiday break during the following period.
Holiday Schedule
• February 15 – February 27, 2026
• Regular operations resume on February 28, 2026
We wish you a joyful Chinese New Year and a happy Year of the Horse.
-1-473x1024.webp)
Important Notice for Equipment During the Holiday
To ensure equipment safety and long-term stability during the extended shutdown, please complete the following checks before the holiday.
No.1* Equipment Cleaning
Clean all workpieces, fixtures, electrical cabinets, and residual debris inside the machine.
Wipe the external panels to keep the equipment clean and dust-free.
No.2* Anti-Rust Protection
After cleaning the worktable, apply anti-rust oil evenly.
Run the machine at low speed for about 1 hour to fully lubricate linear guides, ball screws, and sliding components.
No.3* Power-Off and Axis Reset
Turn off the power and air supply.
Return the X / Y / Z axes to the home position.
No.4* Moisture and Water Protection
Recommended storage conditions:
Temperature: 24 ± 2°C
Humidity: 60% ± 10% RH
Please ensure proper moisture-proof and water-proof protection.
No.5* Rodent Prevention
Ensure the equipment is well sealed.
Take necessary anti-rodent measures to prevent cable damage.
Thank you for your continued trust and support.
If you need assistance before or after the holiday, please feel free to contact us.
Warm regards,
Seprays Group




